What We Do
In the fall semester, the Cal Steel Bridge Team works on the design of the bridge. All members participate in design teams to determine the best design according to the rules for the year. By the end of the design segment, every individual is proficient in AutoCAD and SAP2000. After determining our design, our SolidWorks team produces shop drawings for fabrication. In the spring semester, the team heads over to one of two shops: Davis or Etcheverry. In the shops, students fabricate every single member and connection on the bridge. After fabrication, we put our construction team to work on putting our bridge together quickly and efficiently. Our team is open to all majors and no prior knowledge is required. We'll teach you everything from the ground up!